
Subscribe To Our Newsletter!
Subscribe to the newsletter to stay up to date with the latest news and most useful
Newsletter
↑
Back to Top
Product Overview |
|---|
The IBM 2320-Watts AC Power Supply for BladeCenter E is designed to reliably power BladeCenter E servers, fitting neatly into the chassis to support enterprise-grade computing. It handles significant power loads while keeping the system stable and efficient, making it a key component in data center environments. |
General Information |
|
|---|---|
| Brand | IBM |
| Part Number | 39Y7405 |
| Product Type | Server Power Supply |
| Condition | Refurbished |
Technical Information |
|
|---|---|
| Input Voltage | 100-240V AC |
| Input Frequency | 50-60 Hz |
| Output | 12V DC |
| Hot Swappable | Yes |
| Redundant Support | Yes |
| Cooling Type | Active Fan |
| Modularity | Non-Modular |
| rail_design | Single 12V Rail |
| Number of Fans | 2 |
Compatibility |
|
|---|---|
| Form Factor | Proprietary |
| Compatible For | BladeCenter E |
Physical Characteristics |
|
|---|---|
| Weight | 3.00 |
Product Description |
|---|
This IBM 2320-watt AC power supply is built to provide consistent and reliable power to BladeCenter E server chassis. It plays a critical role in maintaining stable operation for blade servers, which are often used in data centers and enterprise IT environments. Typically found in server rooms or data centers, this power supply supports IT professionals and system administrators who manage BladeCenter E systems, ensuring that the infrastructure runs smoothly without unexpected power interruptions. Key Features
The power supply is most often deployed in enterprise server setups where BladeCenter E chassis are used. It plays a vital role in keeping critical applications and services powered continuously. By delivering stable and efficient power, it helps organizations avoid downtime and maintain smooth IT operations. |
Use Cases |
|---|
The IBM 2320-Watt AC Power Supply for BladeCenter E is primarily utilized in enterprise data centers and IT environments where BladeCenter E chassis are deployed. It is essential for organizations requiring stable and high-capacity power delivery to rack-mounted blade servers, supporting workloads that demand continuous uptime and efficient resource use. How It's Used:
By delivering robust and efficient power, this supply ensures BladeCenter E environments maintain operational stability and scalability. It supports critical computing tasks by reducing power-related interruptions, thereby enhancing overall system reliability and performance in demanding enterprise settings. |